Our projects

Works in process

MC Kontrakty Budownictwo Sp. z o.o.

Execution, delivery and assembly of steel structure - approx. 230 t - Extension of AVON factory in Garwolin

Under construction

Commune Wysoka

General contractorship building of the sports hall in Wysoka commune.

Under construction

Commune Komorniki

General contractoship reconstruction and modernisation of the Commune Hall in Komorniki.

Under construction

AQUA-ZDRÓJ Sp. z o.o. Wałbrzych

General contractorship of AQUA-ZDRÓJ Tourism & Sport Center in Wałbrzych

Under Construction

 

RD-Bud Sp. z o.o. Warszawa

Execution, delivery and assembly of steel structure – approx. 137 t – ECH trade center in Wałbrzych

Under construction

SAKANSKA S.A.Poznań

Execution, delivery and assembly of steel structure – approx.  88 t –     MPT TABO Sp. z o.o. facilities in Bogucin

Under construction

Erbud                    Szczecin

Execution, delivery and assembly of steel structure – approx. 146 t – Trade center PIAST  in Szczecin

Under construction

RD-Bud Sp. z o.o.
Warszawa

Execution, delivery and assembly of steel structure – approx. 226 t – IKEA store in Kraków

Under construction

ATA-Technik
Budzyń

Execution, delivery and assembly of steel structure – approx. 14 t –  ATA-Technik workshop hall in Budzyń

Under construction

 

Works completed

2010

FUGO S.A. Konin  

Assembly of steel structure – approx. 1564 t – steel structure of roof truss and associated structures of Poznań Principal Stadium.

April, 2010

JAKON Sp. z o.o. Tarnowo Podgórne

Execution, delivery and assembly of steel structure – approx. 385 t – steel structure of Hempel facility in Niepruszewo.

June.2010

FUGO S.A. Konin

Assembly of steel structure – approx. 2500 t – steel structure of main trusses of the south and north grandstand of the Poznań Principal Stadium.

April, 2010

FUGO S.A. Konin

Assembly of steel structure – approx. 920 t – steel structure of main trusses of the west and east grandstand of the Poznań Principal Stadium

April, 2010

RD bud Sp. z o.o.
Warszawa

Execution, delivery and assembly of steel structure – approx. 75 t – Steel structure of the DECATHLON facilities in Legnica

 February 2010

2009

Kajima Europe Design & Construction
Sp. z o.o.
Poland Division
Warsaw

Execution, delivery and assembly of steel structure – approx. 300 t – Steel structure of the FRIGO LOGISTIC freezer facilities in Radomsko

 February 2009

MC Kontrakty
Budowlane Sp. z o.o.
Łódź

Execution, delivery and assembly of steel structure – approx. 286 t – Steel structure of the SCA Oława production plant, stage III

April 2009

Młodzieżowe Centrum Sportu (Youth Sport Centre)
Wrocław

General contractorship, reconstruction and extension of the WKS Śląsk sport club building in Wrocław, ul. Oporowska 62

March 2009

Mirbud S.A.
Skierniewice

Execution, delivery and assembly of steel structure – approx. 500 t – Steel structure of the Kongskilde production plant in Kutno, extension

May 2009

Kajima Europe Design
& Construction
Sp.z o.o.
Poland Division
Warsaw

Execution, delivery and assembly of steel structure – approx. 307 t – Steel structure of the Europolis Alliance Logistic Center 1, Błonie, hall no. 12

May 2009

RD bud Sp. z o.o.
Warsaw

Execution, delivery and assembly of steel structure – approx. 56.50 t – Steel structure of Castorama in Zamość

May 2009

PRE-FABRYKAT
Sp. z o.o.
Miłków

Execution, delivery and assembly of steel structure – approx. 90 t – Steel structure of the in the Sport And Entertainment Arena in Karpacz

June 2009

KÖNIG STAHL
Sp. z o.o.
Poznań Division

General contractorship of the storage hall construction, in which execution, delivery and assembly of steel structure – approx. 268 t – KÖNIG STAHL in Poznań

August 2009

Budim Sp. z o.o.
Gorzów Wielkopolski

Execution, delivery and assembly of steel structure – approx. 220 t – Steel structure of Castorama in Jelenia Góra

October 2009

 

 

Rok 2008

Budimex Dromex S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 1 355 t – including assembly of reinforced precast concrete elements, i.e. poles, beams and slabs – PAROC plant in Trzemeszno

January 2008

Skanska S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 352 t – Steel structure of Leroy Merlin in Rumia

January 2008

Kajima Europe Sp. z o.o.
Warsaw

Execution, delivery and assembly of steel structure – approx. 214 t – Steel structure of REYNAERS in Piaseczno

February 2008

Gmina Stoszowice
(the Stoszowice commune)

General contractorship of the gymnasium construction project, back-up facilities and connecting passage included, of the Middle School in Budzów

February 2008

Skanska S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 392 t – Steel structure of Leroy Merlin in Łagów near Zgorzelec

February 2008

Jakon Sp. z o.o.
Tarnowo Podgórne

Execution, delivery and assembly of steel structure – approx. 110 t – Steel structure of PANOPA in Swarzędz

March 2008

KÖNIG STAHL Sp. z o.o.
Warsaw

General contractorship of a trade and service building construction project, auxiliary infrastructure included, in Poznań, ul. Ostrowska 504

May 2008

RD bud Sp. z o.o.
Warsaw

Execution, delivery and assembly of steel structure – approx. 100 t – Steel structure of Europejskie Centrum Handlowe (European Commercial Centre) in Legnica

June 2008

Pol-Aqua S.A.
Gdańsk Division

Execution, delivery and assembly of steel structure – approx. 750 t – Steel structure of AUCHAN in Szczecin

September 2008

Kajima Europe Sp. z o.o.
Warsaw

Execution, delivery and assembly of steel structure – approx. 400 t – Steel structure of CLD Prologis in Wola Bykowska

September 2008

Gmina Sulików
(the Sulików commune)

General contractorship of communal gymnasium construction project in Sulików

September 2008

PW Bolesław Spochacz
Ruszkowo
Środa Wlkp.

Execution, delivery and assembly of steel structure – approx. 100 t – Steel structure of Gymnasium in Września

October 2008

RD bud Sp. z o.o.
Warszawa

Execution, delivery and assembly of steel structure – approx. 355 t – Steel structure of Auchan in Częstochowa

November 2008

RD bud Sp. z o.o.
Warsaw

Execution, delivery and assembly of steel structure – approx. 220 t – Steel structure of Castorama in Nowy Targ

November 2008

 

Rok 2007

PRE-FABRYKAT
Sp. z o.o.
Miłków

Execution, delivery and assembly of steel structure - FPP processing plant in Piechowice - approx. 130 t

January 2007

Budim Sp. z o.o.
Gdańsk

Execution, delivery and assembly of steel structure and advertising pylon – approx. 260 t and advertising pylon – approx. 26 t – CASTORAMA in Słupsk

March 2007

PPU Bumet
Gorzów Wielkopolski

Execution, delivery and assembly of steel structure – Auchan Commercial Gallery in Racibórz – approx. 800 t

April 2007

Kajima Europe Sp. z o.o. Warsaw

Execution, delivery and assembly of steel structure – extension of the Elektrolux plant in Oława – approx. 350 t

June 2007

Urząd Miejski
(City Hall)  Gniezno

General contractorship of extension project of indoor swimming pool for non-swimming and disabled in Gniezno, ul. Bł. Jolenty 5

July 2007

CFE Sp. z o.o. Polska Warsaw

Execution, delivery and assembly of steel structure – approx. 700 t – assembly of reinforced precast concrete elements, i.e. poles, beams and slabs – CARREFOUR in Białystok

September 2007

 

Rok 2006

Maxer S.A.
Poznań

Execution, delivery and assembly of roofing of the 4th grandstand of the Poznań Municipal Stadium – approx. 300 t 

March 2006

Projprzem S.A.
Bydgoszcz

Execution, delivery and assembly of the Europlastik production hall in Strzebielin – 47 t

January 2006

Budim Sp. z o.o.
Gdańsk

Execution, delivery and assembly of steel structure and advertising pylon – approx. 263 t and advertising pylon – approx. 26 t – for CASTORAMA in Szczecin

May 2006

Polimex-Mostostal S.A.
Siedlce

Assembly of 102 reinforced precast concrete poles at the Commercial Centre Pasaż Świętokrzyski Kielce in Ślichowice

June 2006

Hochtief Polska
Poznań Division

Execution, delivery and assembly of steel structure for the Huta Jedlice steel plant in Ozimek near Opole – 157 t

July 2006

Budimex Dromex S.A.
Poznań

Execution, delivery and assembly of steel structure – Electro World facilities in Bielany Wrocławskie – approx. 150 t

August 2006

Wrobis S.A.
Wrocław

Execution, delivery and assembly of steel structure – the SCA Hygienes plant hall in Oława – approx. 260 t

September 2006

Urząd Miasta i Gminy
(City and Municipality Office) Kąty Wrocławskie

General contractorship of gymnasium construction project, back-up and technical facilities, as well as connecting passage included, in Gniechowice

October 2006

Budimex Dromex S.A.
Poznań

Execution, delivery and assembly of steel structure – expedition and distribution centre facilities of Poczta Polska (Polish Post) in Wrocław – approx. 870 t of hot dipped galvanised structure

November 2006

Nickel Sp. z o.o.
Poznań

Execution, delivery and assembly of steel structure – the AXPOL hall in Złotniki near Poznań – approx. 85 t

November 2006

Kajima Europe Sp. z o.o.
Warsaw

Execution, delivery and assembly of steel structure of the JOHNSON CONTROLS plant in Siemianowice Śląskie – approx. 1000 t

November 2006

Rok 2005

Urząd Miasta i Gminy
(City and Municipality Office)
Kąty Wrocławskie

General contractorship of gymnasium construction project, back-up and technical facilities, as well as connecting passage included, in Jaszkotle

January 2005

Pekabex BET Sp. z o.o.
Poznań

Assembly of reinforced concrete structure – extension of VOLKSWAGEN in Poznań

February 2005

Budim Sp. z o.o.
Gdańsk

Execution, delivery and assembly of steel structure and advertising pylon - approx. 258 t – CASTORAMA in Lubin

May 2005

Budimex Dromex S.A.
Poznań

Execution, delivery and assembly of advertising pylon steel structure – approx. 25.6 t – POLIMENI in Gniezno

April 2005

Fugo S.A.
Konin

Execution, delivery of steel structure of the Silesia City Center in Katowice – approx. 1 150 t

September 2005

Jedynka Skanska S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 190 t – LEROY MERLIN in Toruń

August 2005

Budimex Dromex S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 300 t – AMICA Finished Products Store in Wronki

September 2005

Kajima Europe Sp. z o.o.
Warsaw

Assembly of reinforced concrete poles, as well as execution and assembly of steel structure – approx. 710 t – Elektrolux in Oława

September 2005

Pekabex BET Sp. z o.o.
Poznań

Assembly of reinforced concrete structure – Kaufland commercial centre in Mysłowice

August 2005

Skanska S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 300 t – Steel structure of Leroy Merlin in Kalisz

November 2005

Skanska S.A.
Poznań

Execution, delivery and assembly of steel structure – approx. 600 t – Structure of the SOLARIS bus manufacture plant in Bolechowo

December 2005

Tenant Management Organisation Wrzosowa Wspólnota Mieszkaniowa Kórnik

General contractorship of construction project of 40-family block of flats with 17 garages in Kórnik, ul. Staszica 21

December 2005

Rok 2004

LPB SKANSKA S.A. Leszno

Execution and assembly of steel structure – “Rolpek 2” meat processing plant in Strzegom – approx. 60 t

January 2004

Pekabex BET Sp. z o.o. Poznań

Execution and assembly of steel structure for extension of the Sitech plant in Polkowice

May 2004

PPU Grzybowski Bogdanowo

Execution – approx. 600 t – and assembly – approx. 1100 t – of steel structure at the site of Auchan in Wałbrzych

June 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete poles, as well as execution and assembly of steel structure of the EUROCOMFORT IV Commercial Centre in Leszno – approx. 290 t

June 2004

Pekabex BET Sp. z o.o. Poznań

Execution and assembly of service platforms within the site of Bombardier in Wrocław – approx. 43 t

June 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure of two-level hall – Kaufland in Ełk

June 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure of the Kaufland hall in Bełchatów

July 2004

Budimex Dromex S.A. Kraków

Execution and assembly of steel structure of the Municipal Waste Sorting Hall in Łódź – approx. 435 t

August 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure of the Kaufland hall in Elbląg

September 2004

PUP Grzybowski Bogdanowo

Assembly of steel structure – approx. 125 t – Jeronimo Martins contruction in Wyszków

September 2004

Budim Sp. z o.o. Gdańsk

Execution and assembly of steel structure based on reinforced concrete poles assembled by M-S – Castorama commercial facilities in Kraków

October 2004

Budimex Dromex S.A. Poznań

Execution, delivery and assembly of steel structure – approx. 90 t – Water Treatment Station in Mosina

November 2004

Zeman HDF Sp. z o.o.

Execution and delivery of steel structure – TESCO in Mielec – approx. 262 t

November 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure - Kaufland commercial centre in Zabrze

October 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure - Kaufland commercial centre in Bielsk Podlaski

October 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure - Kaufland commercial centre in Kalisz

November 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure - Kaufland commercial centre in Jarocin

November 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure - Kaufland commercial centre in Leszno

November 2004

DGS Sp. z o.o. Radomsko

Assembly of the Intermarche and Bricomarche shopping centre in Polkowice – approx. 171 t

November 2004

Budim Sp. z o.o. Gdańsk

Execution, delivery and assembly of shelter and advertising pylon - CASTORAMA in Gdańsk - approx. 34 t

December 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure – Kaufland commercial centre in Wołomin

December 2004

Pekabex BET Sp. z o.o. Poznań

Delivery and assembly of steel structure – approx. 520 t – Sanden construction in Polkowice

December 2004

Budim Sp. z o.o. Gdańsk

Execution, delivery and assembly of steel structure of partition walls and stairs Castorama in Zielona Góra – approx. 25 t

January 2005

Pekabex BET Sp. z o.o. Poznań

Execution, delivery and assembly of steel structure – extension of a warehouse – KÖNIG STAHL in Poznań 90 t

March 2005

Pekabex BET Sp. z o.o. Poznań

Assembly of 67 reinforced precast concrete poles, Kuźnia construction site in Oleśnica

January 2005

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure – Kaufland commercial centre in Sochaczew

March 2005

Pekabex BET Sp. z o.o. Poznań

Assembly of 39 reinforced precast concrete poles – Winkelmann III construction in Legnica

December 2004

KSM Taskomont 1 Poznań Sp. z o.o. Poznań

Assembly of steel structure of the Bemo Motors car showroom in Poznań – approx. 58 t

December 2004

Pekabex BET Sp. z o.o. Poznań

Assembly of reinforced concrete structure –Lisner in Poznań

December 2004

Rok 2003

RESCO Sp. z o.o. Jastrowo near Szamotuły

Execution, delivery and assembly of steel structure of a hall – construction of a warehouse, light insulated roof panels

January 2003

BORGA HOLDING
Sp. z o.o.
Gdynia

Execution and delivery of steel structure of a hall – approx. 80 t – DRUTEX in Bytów near Słupsk

March 2003

BORGA HOLDING
Sp. z o.o.
Gdynia

Execution and delivery of steel structure of a hall - approx. 42 t – VBW CLIMA in Gdynia

March 2003

MT Polska Sp. z o.o. Łódź

Execution, delivery and assembly of steel structure of a hall – approx.
1 205 t – IKEA LOGISTIC stage I in Jesipow near Moscow, the Russian Federation

May 2003

Budimex Dromex S.A. Poznań

Execution, delivery and assembly of steel structure of a hall – 410 t – COCPIT in Swarzędz near Poznań

May 2003

JEDYNKA SKANSKA Poznań

Execution, delivery and assembly of steel structure of a hall – approx. 425 t – LEROY MERLIN in Swarzędz near Poznań

May 2003

Budimex Dromex S.A. Poznań

Execution, delivery and assembly of steel structure of a hall – approx. 587 t – FAURECJA in Gorzów Wielkopolski

May 2003

TRASCO INVEST
Sp. z o.o.
Ostrzeszów

Execution, delivery and assembly of steel structure elements – approx. 42 t – GEMO in Komorniki near Poznań

June 2003

Budimex Dromex S.A. Poznań

Execution, delivery and assembly of steel structure of a hall – approx. 840 t – SELGROS in the RËNK Wholesale Centre in Gdańsk

June 2003

MITEX S.A. Kielce

Execution and delivery of steel structure elements – approx. 184 t – CERSANIT in Wałbrzych

August 2003

BICK S.A. Kielce

Execution, delivery and assembly of steel structure of Sport And Entertainment Arena – approx. 220 t  – Flame Control No. 173 fire resistance system protection included – construction of Ursynowskiego Centrum Sportu i Rekreacji (Ursynów Sport and Entertainment Centre) in Warsaw

September 2003

BICK S.A. Kielce

Delivery and assembly of roof trapezoidal metal sheets on the Sport And Entertainment Arena roofing – approx. 3 853 m2 – construction of Ursynowskiego Centrum Sportu i Rekreacji (Ursynów Sport and Entertainment Centre) in Warsaw

September 2003

LPB SKANSKA S.A. Leszno

Execution and assembly of steel structure for BIODAMA construction in Sława – approx. 80 t

September 2003

TRASCO INVEST
Sp. z o.o.
Ostrzeszów

Execution, delivery and assembly of steel structure of a hall - approx. 210 t – LEC BLACK RED WHITE in Sady near Poznań

September 2003

Pekabex BET Sp. z o.o. Poznań

Assembly of steel structure of a hall – Kaufland in Żory – usable area of approx. 5 000 m2

September 2003

Fundacja Rozwoju Sportu Szkolnego (School Sports Development Foundation) Poznań

Execution, delivery and assembly of steel structure of a hall – approx. 334 t – construction of Indoor Ice Rink in Poznań, including light wall lining of 4 780 m2 of surface and light insulated roof panels of 6 760 m2 of surface

October 2003

Bumet Ośno Lubuskie

Assembly of steel structure of a hall – Castorama in Legnica – approx. 440 t

November 2003

Pekabex BET Sp. z o.o. Poznań

Assembly of steel structure of a hall – Kaufland in Kraków – usable area of approx. 14 000 m2

November 2003

Pekabex BET Sp. z o.o. Poznań

Assembly of steel structure of a hall – Kaufland in Hajnówka – usable area of approx. 4 000 m2

November 2003

Condix S.A. Poznań

Execution, delivery and assembly of steel structure of the Tłocznia Blach (Sheet-Metal Forming Company) in Września – approx. 1 000 t

November 2003

Rok 2002

MT Polska Sp. z o.o. Łódź

Execution and delivery of steel structure – approx. 333 t – construction of the WAPCO NIGERIA EWECORO cement plant in Nigeria

April 2002

MT Polska Sp. z o.o. Łódź

Execution, delivery and assembly of steel structure of a hall - approx. 362 t –CASTORAMA in Łódź

April 2002

DORBUD S.A. Kielce

Execution, delivery and assembly of steel structure of a hall – approx. 12 t – delivery and assembly of Królczyk insulated multilayer roof panels of surface of 391.25 m2 – construction of Gymnasium at Primary School no. 231 in Warsaw

April 2002

DORBUD S.A. Kielce

Assembly of steel structure of a hall – approx. 34 t – delivery and assembly of Królczyk insulated multilayer roof and wall panels of surface of 1 701.99 m2 – construction of Gymnasium at Primary School no. 2 in Warsaw

June 2002

KÜTNER Gmbh
& Co. KG Essen
Germany

Execution and delivery of steel structure of a liquid storage tank - approx. 169 t – construction site in Denmark

June 2002

BORGA HOLDING
Sp. z o.o.
Gdynia

Execution and delivery of steel structure of a hall - approx. 66 t – BAJCAR 2 construction in Słupsk

June 2002

LPB SKANSKA S.A. Leszno

Execution, delivery and assembly of steel structure of a hall - approx. 128 t – HORSES AND FOALS ABBATOIR construction site in Rawicz

July 2002

JEDYNKA SKANSKA Poznań

Execution, delivery and assembly of steel structure of a hall, Flame Control No. 173 fire resistance system protection included – approx. 450 t – LEROY MERLIN in Komorniki near Poznań

August 2002

BORGA HOLDING
Sp. z o.o.
Gdynia

Execution and delivery of steel structure of a hall – approx. 95 t – construction site of the SAINT-GOBAIN SECURIT production plant in Żary

September 2002

FTL POLSKA Sp. z o.o. Legnica

Execution, delivery and assembly of steel structure of a hall – approx. 126 t – construction of the Option II VOLKSWAGEN MOTOR POLSKA hall in Polkowice

October 2002

AK-BUD KURANT Sp. J. Poznań

Execution, delivery and assembly of steel structure for construction of grandstand sector fencing at the Poznań Municipal Stadium, fencing wire included

October 2002

Budimex Dromex S.A. Poznań

Execution, delivery and assembly of steel structure of a hall - approx. 493 t – for the Inter Logistyk Swarzędz VOLKSWAGEN construction in Swarzędz near Poznań

October 2002

EKOMECH Sp. z o.o. Wałcz

Assembly of steel structure – approx. 401 t – and roof trapezoidal metal sheets of surface of 13 700 m2 for the RABEN Storage no. 6 construction in Gądki near Poznań

October 2002

FTL POLSKA Sp. z o.o. Legnica

Execution, delivery and assembly of steel structure of a hall - approx. 141 t – construction of the VOLKSWAGEN MOTOR Option II facilities in Polkowice

October 2002

CONDIX S.A. Poznań

Execution and delivery of steel roofing purlins of a hall – approx. 3 t – extension of the STEINPOL plant in Rzepiń

November 2002

CONDIX S.A. Poznań

Execution and delivery of steel structure of a hall – approx. 42 t – TESSAG construction in Świecie

November 2002

CONSTRUCTA PLUS |
Sp. z o.o.
Poznań

Execution, delivery and assembly of steel structure of a hall – approx. 25 t – construction of the RABEN pallet storage in Robakowo near Poznań, roof trapezoidal metal sheets included

December 2002

CONSTRUCTA PLUS
Sp. z o.o.
Poznań

Execution, delivery and assembly of steel structure of a hall – construction of RABEN LOGISTICS Warehouse no. 1 approx. 147 t – and Szybka Paczka – approx. 60 t – in Straszyn near Pruszcz Gdański

December 2002

BORGA HOLDING
Sp. z o.o.
Gdynia

Execution and delivery of steel structure of a hall - approx. 59 t – construction of the SZALPOL production plant in Legionowo near Warsaw

December 2002

UNI-BOX Poznań

Fronton outbuilding – two-storey office building of usable surface of 142 m2 – extension of a Production Plant in Suchy Las


December 2002

 